methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper radar with five axes, two current and target profiles, and evidence cards beside each dimension.
Decision Making
Radar
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration for ABC Analysis
Operations
ABC Analysis
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
When capabilities, maturity levels, or market positions need to be compared across several dimensions, overview is easily lost. Radar brings different characteristics into a shared picture and shows patterns faster than tables do.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
MediumMediumLowLow
Timedifferent
1-2 h2–4 h review as a planning range; preparation and evaluation additional30-60 min60-90 min
Participantsdifferent
2-10Designers, developers as users, and facilitation1-54-12
Formatdifferent
Workshop + asyncWorkshop + asyncAsyncWorkshop
Outputdifferent
Radar Map, Capability Scores, Action AreasPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsABC Classification, Focus Rules, Control ListAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
AssessmentPortfolioCapability
ArchitectureEngineeringFeedbackValidationTasks
PrioritizationOperationsPortfolio
RiskArchitectureWorkshopValidation
Add more methods