methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper radar with five axes, two current and target profiles, and evidence cards beside each dimension.
Decision Making
Radar
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for ABC Analysis
Operations
ABC Analysis
Purposedifferent
When capabilities, maturity levels, or market positions need to be compared across several dimensions, overview is easily lost. Radar brings different characteristics into a shared picture and shows patterns faster than tables do.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.
Complexitydifferent
MediumLowLowLow
Timedifferent
1-2 h1-2 Tage30-60 min30-60 min
Participantsdifferent
2-101-43-101-5
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncAsync
Outputdifferent
Radar Map, Capability Scores, Action AreasArchitecture Document, Context View, Runtime View, Deployment ViewRisk Matrix, Top Risk ListABC Classification, Focus Rules, Control List
Tagsno overlap
AssessmentPortfolioCapability
ArchitectureDocumentationCommunication
RiskDecisionPrioritizationAssessment
PrioritizationOperationsPortfolio
Add more methods