View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture Quality Attribute Workshop | ![]() Decision Making Pre-Mortem | ![]() Architecture Risk Storming | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | A Quality Attribute Workshop translates quality requirements into concrete scenarios and architecture impulses. The method brings product, engineering, and operations to the same view of desired properties. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Medium | Low | Low | Low |
Timedifferent | 2-4 h | 20–45 min | 60-90 min | 45-90 min |
Participantsdifferent | 5-15 | Small cross-functional group | 4-12 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop | Workshop + async |
Outputdifferent | Quality Scenarios, Priority List, Architecture Concerns | Risk list, Mitigation plan, Assumption log | Annotated Diagram, Prioritized Risk List, Action Backlog | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | RequirementsArchitectureWorkshop | RiskDecisionFailurePlanning | RiskArchitectureWorkshopValidation | AssumptionsRiskDecisionDiscovery |



