View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture Quality Attribute Workshop | ![]() Decision Making Pre-Mortem | ![]() Product Discovery Assumption Mapping | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | A Quality Attribute Workshop translates quality requirements into concrete scenarios and architecture impulses. The method brings product, engineering, and operations to the same view of desired properties. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Medium | Low | Medium | Low |
Timedifferent | 2-4 h | 20–45 min | 45-60 min | 45-90 min |
Participantsdifferent | 5-15 | Small cross-functional group | 2-8 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Quality Scenarios, Priority List, Architecture Concerns | Risk list, Mitigation plan, Assumption log | Assumption map, Test backlog, Risk ranking | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | RequirementsArchitectureWorkshop | RiskDecisionFailurePlanning | AssumptionsRiskExperimentsValidation | AssumptionsRiskDecisionDiscovery |



