View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Product Strategy Product Canvas | ![]() Operations Kaizen Event | ![]() Operations Gemba Walk | ![]() Operations PDCA Cycle |
|---|---|---|---|---|
Purposedifferent | When product goal and feature scope don't yet fit cleanly together, it creates a shared working picture. It connects need, core features, and assumptions into a solid starting point. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | When there is uncertainty about the real course of a process, the method brings observation to the place where work happens. It combines perception, follow-up questions, and process knowledge so decisions rest on actual workflows instead of assumptions. | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. |
Complexitydifferent | Medium | Medium | Low | Low |
Timedifferent | 1-2 h | 0.5-5 Tage | 30-120 min | 1 h bis mehrere Wochen |
Participantsdifferent | 2-8 | 4-10 | 2-6 | 1-8 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop + async |
Outputdifferent | Product Canvas, Product Assumptions, Scope Notes | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | Observation Notes, Improvement Ideas | PDCA Log, Experiment Plan, Learning Outcome, Standard Change |
Tagsno overlap | CanvasDiscoveryScope | LeanContinuous improvementOperations | LeanObservationProcessOperations | Continuous improvementLeanExperiments |



