methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Problem Framing Workshop.
Facilitation
Problem Framing Workshop
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
When a team works on symptoms but the real question stays fuzzy, a Problem Framing Workshop sharpens the view of the right problem. It separates observation, interpretation, and target picture from each other.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
LowLowHighLow
Timedifferent
60-120 min30-60 minSeveral meetings plus preparation and analysis; total effort depends on scope30-60 min
Participantsdifferent
4-103-10Evaluation team, architects, and relevant stakeholders2-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Problem Statement, Scope Boundaries, Assumption List, Next Analysis QuestionsRisk Matrix, Top Risk ListPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
FacilitationAlignmentDiscovery
RiskDecisionPrioritizationAssessment
ArchitectureQualityRiskTradeoffsStakeholders
StakeholdersFacilitationAlignmentPlanning
Add more methods