methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Pretotyping with its method-specific working model.
Product Discovery
Pretotyping
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Purposedifferent
Pretotyping clarifies whether a customer problem and solution idea create enough real demand. It separates problem, assumption, solution, and evidence, and captures the result as a pretotyping sketch, test setup, and conversion data.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.
Complexitydifferent
LowHighLowLow
Timedifferent
Stunden bis wenige TageSeveral meetings plus preparation and analysis; total effort depends on scope30 min Setup, dann laufend15-45 min
Participantsdifferent
1-4Evaluation team, architects, and relevant stakeholders1-3 maintaining, briefing for everyone1-3
Formatdifferent
Workshop + asyncWorkshop + asyncAsyncAsync
Outputdifferent
Pretotyping sketch, Test setup, Conversion data, Go or no-go decisionPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsRAID Log, Status Report SourceADR File, Decision Log, Rationale
Tagsno overlap
ValidationDemandMVP
ArchitectureQualityRiskTradeoffsStakeholders
RiskTrackingStakeholdersGovernance
ArchitectureRationaleDocumentationGovernance
Add more methods