methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.
Complexitydifferent
LowMediumLowLow
Timedifferent
20–45 min1-3 Tage30 min Setup, dann laufend15-45 min
Participantsdifferent
Small cross-functional group1-41-3 maintaining, briefing for everyone1-3
Formatdifferent
WorkshopWorkshop + asyncAsyncAsync
Outputdifferent
Risk list, Mitigation plan, Assumption logArchitecture Views, Cross-view Notes, RationaleRAID Log, Status Report SourceADR File, Decision Log, Rationale
Tagsno overlap
RiskDecisionFailurePlanning
DocumentationStakeholdersArchitecture
RiskTrackingStakeholdersGovernance
ArchitectureRationaleDocumentationGovernance
Add more methods