methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Trade-off Analysis.
Decision Making
Trade-off Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.With limited resources, quality, speed, cost, and risk almost always compete with each other. Trade-off Analysis makes these tensions explicit and prevents decisions from producing hidden side effects.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.
Complexitydifferent
LowMediumHighLow
Timedifferent
20–45 min45-120 min90-180 min30-90 min
Participantsdifferent
Small cross-functional group2-83-82-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Risk list, Mitigation plan, Assumption logTrade-off Matrix, Criteria List, Decision Rationale, Accepted DownsidesCoD Table, Prioritization SequenceConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries
Tags1 shared
RiskDecisionFailurePlanning
TradeoffsDecisionCriteriaOptions
PrioritizationDeliveryEconomicsDecision
ConstraintsDecisionPlanningOptions
Add more methods