View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Pre-Mortem | ![]() Product Discovery Test Card | ![]() Decision Making Constraint Analysis | ![]() Product Discovery MVP Test Matrix |
|---|---|---|---|---|
Purposedifferent | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | The Test Card turns a critical assumption into a testable claim and specifies in advance which result counts as success. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. | When several minimal variants compete to answer the same question, it makes comparing and choosing between them cleaner. It separates problem, assumption, solution, and evidence. The result is captured as a Test Matrix and a Test Plan. |
Complexitydifferent | Low | Low | Low | Medium |
Timedifferent | 20–45 min | 20-35 min | 30-90 min | 45-75 min |
Participantsdifferent | Small cross-functional group | 1-5 | 2-8 | 2-8 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Risk list, Mitigation plan, Assumption log | Test Card with a pre-set threshold | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries | Test Matrix, Test Plan |
Tagsno overlap | RiskDecisionFailurePlanning | ExperimentsValidationDiscoveryHypothesis | ConstraintsDecisionPlanningOptions | ExperimentsValidationDiscoveryOptions |



