View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Red Teaming method illustration showing its working structure
Decision Making
Red Teaming
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.For strategic decisions with high reach, agreement and gut feeling are often not enough. Red teaming brings deliberate opposition into the situation and tests where a plan breaks under real counterarguments.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.
Complexitydifferent
LowLowHighLow
Timedifferent
20–45 min30-60 min1-4 h45-90 min
Participantsdifferent
Small cross-functional group3-103-82-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Risk list, Mitigation plan, Assumption logRisk Matrix, Top Risk ListChallenge Findings, Risk Register, Mitigation PlanAssumption List, Critical Assumptions, Learning Plan
Tags2 shared
RiskDecisionFailurePlanning
RiskDecisionPrioritizationAssessment
RiskDecisionSensemaking
AssumptionsRiskDecisionDiscovery
Add more methods