methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of the Force Field Analysis working structure.
Decision Making
Force Field Analysis
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.In change initiatives, supporting and restraining forces sit at the table at the same time. Force Field Analysis makes these tensions explicit and shows where change can be pushed forward by strengthening or relieving.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.
Complexitysame
LowLowLowLow
Timedifferent
20–45 min30-60 min45-90 min30-90 min
Participantsdifferent
Small cross-functional group3-103-122-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Risk list, Mitigation plan, Assumption logRisk Matrix, Top Risk ListForce Field Map, Change Levers, Risk NotesConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries
Tags1 shared
RiskDecisionFailurePlanning
RiskDecisionPrioritizationAssessment
ChangeDecisionStrategy
ConstraintsDecisionPlanningOptions
Add more methods