methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.
Complexitydifferent
LowLowHighLow
Timedifferent
20–45 min30-60 min90-180 min30-90 min
Participantsdifferent
Small cross-functional group3-103-82-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Risk list, Mitigation plan, Assumption logRisk Matrix, Top Risk ListCoD Table, Prioritization SequenceConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries
Tags1 shared
RiskDecisionFailurePlanning
RiskDecisionPrioritizationAssessment
PrioritizationDeliveryEconomicsDecision
ConstraintsDecisionPlanningOptions
Add more methods