View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Pre-Mortem | ![]() Decision Making Risk Matrix | ![]() Decision Making Constraint Analysis | ![]() Delivery Cost of Delay |
|---|---|---|---|---|
Purposedifferent | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. |
Complexitydifferent | Low | Low | Low | High |
Timedifferent | 20–45 min | 30-60 min | 30-90 min | 90-180 min |
Participantsdifferent | Small cross-functional group | 3-10 | 2-8 | 3-8 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Risk list, Mitigation plan, Assumption log | Risk Matrix, Top Risk List | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries | CoD Table, Prioritization Sequence |
Tags1 shared | RiskDecisionFailurePlanning | RiskDecisionPrioritizationAssessment | ConstraintsDecisionPlanningOptions | PrioritizationDeliveryEconomicsDecision |



