View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for ALPEN Method
Operations
ALPEN Method
Paper illustration for ABC Analysis
Operations
ABC Analysis
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time.With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.
Complexitysame
LowLowLowLow
Timedifferent
20–45 min30-60 min10-20 min daily30-60 min
Participantsdifferent
Small cross-functional group3-1011-5
Formatdifferent
WorkshopWorkshop + asyncAsyncAsync
Outputdifferent
Risk list, Mitigation plan, Assumption logRisk Matrix, Top Risk ListDaily Plan, Time Estimates, Review NotesABC Classification, Focus Rules, Control List
Tagsno overlap
RiskDecisionFailurePlanning
RiskDecisionPrioritizationAssessment
PlanningTime managementProductivityOperations
PrioritizationOperationsPortfolio
Add more methods