methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Iceberg Model method illustration showing its working structure
Systems Thinking
Iceberg Model
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.The Iceberg Model separates visible events from patterns, structures, and mental models. This turns a single observation into a deeper understanding of why a problem keeps recurring.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.
Complexitydifferent
LowLowLowHigh
Timedifferent
20–45 min30-60 min45-90 min2-6 h
Participantsdifferent
Small cross-functional group2-102-83-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Risk list, Mitigation plan, Assumption logIceberg Worksheet, Pattern Notes, Intervention IdeasAssumption List, Critical Assumptions, Learning PlanCurrent Reality Tree, Core Problems, Intervention Ideas
Tagsno overlap
RiskDecisionFailurePlanning
Systems thinkingRoot causePatterns
AssumptionsRiskDecisionDiscovery
Systems thinkingRoot causeConstraintsCausality
Add more methods