View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Pre-Mortem | ![]() Systems Thinking Future Reality Tree | ![]() Decision Making Decision Tree | ![]() Systems Thinking Evaporating Cloud |
|---|---|---|---|---|
Purposedifferent | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | For decisions with follow-on paths and dependencies, a linear comparison is often not enough. A Decision Tree shows how options branch under conditions and which consequences hang on each branch. | The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict. |
Complexitydifferent | Low | High | Medium | Medium |
Timedifferent | 20–45 min | 2-4 h | 30-90 min | 60-120 min |
Participantsdifferent | Small cross-functional group | 3-8 | 1-6 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop |
Outputdifferent | Risk list, Mitigation plan, Assumption log | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Decision Tree, Option Map, Assumption List | Conflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments |
Tagsno overlap | RiskDecisionFailurePlanning | Theory of ConstraintsSystems thinkingChange | DecisionTreeOptions | Theory of ConstraintsAssumptionsSystems thinking |



