View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Pre-Mortem | ![]() Operations Failure Mode and Effects Analysis | ![]() Decision Making Constraint Analysis | ![]() Operations Kepner-Tregoe |
|---|---|---|---|---|
Purposedifferent | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. | For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations. |
Complexitydifferent | Low | High | Low | High |
Timedifferent | 20–45 min | 2-6 h | 30-90 min | 2-8 h |
Participantsdifferent | Small cross-functional group | 3-10 | 2-8 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Risk list, Mitigation plan, Assumption log | FMEA Table, Risk Priority, Mitigation Actions | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries | Problem Analysis, Decision Analysis, Risk Plan |
Tagsno overlap | RiskDecisionFailurePlanning | RiskQualityOperationsRoot cause | ConstraintsDecisionPlanningOptions | Problem solvingRoot causeDecisionOperations |



