methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Fault Tree Analysis.
Operations
Fault Tree Analysis
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage.For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
LowHighMediumLow
Timedifferent
20–45 min2-6 h45-90 min15-30 min
Participantsdifferent
Small cross-functional group3-82-52-6
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Risk list, Mitigation plan, Assumption logFault Tree, Critical Paths, Cause Hypotheses, Control ActionsA3 Report, Action Plan, Root Cause AnalysisRoot cause notes, Countermeasures
Tagsno overlap
RiskDecisionFailurePlanning
RiskRoot causeSafety
LeanProblem solvingCoachingOperations
Root causeIncidentLeanProblem solving
Add more methods