methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Decision Tree method illustration showing its working structure
Decision Making
Decision Tree
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.For decisions with follow-on paths and dependencies, a linear comparison is often not enough. A Decision Tree shows how options branch under conditions and which consequences hang on each branch.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.
Complexitydifferent
LowMediumHighLow
Timedifferent
20–45 min30-90 min90-180 min45-90 min
Participantsdifferent
Small cross-functional group1-63-82-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Risk list, Mitigation plan, Assumption logDecision Tree, Option Map, Assumption ListCoD Table, Prioritization SequenceAssumption List, Critical Assumptions, Learning Plan
Tags1 shared
RiskDecisionFailurePlanning
DecisionTreeOptions
PrioritizationDeliveryEconomicsDecision
AssumptionsRiskDecisionDiscovery
Add more methods