methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.
Complexitysame
LowLowLowLow
Timedifferent
20–45 min60-90 min60-90 min30-90 min
Participantsdifferent
Small cross-functional group4-104-122-8
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Risk list, Mitigation plan, Assumption logProblem Cluster, Prioritized Challenge, ExperimentAnnotated Diagram, Prioritized Risk List, Action BacklogConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries
Tagsno overlap
RiskDecisionFailurePlanning
FacilitationDecisionProblem solvingWorkshop
RiskArchitectureWorkshopValidation
ConstraintsDecisionPlanningOptions
Add more methods