methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for Causal Factor Analysis.
Operations
Causal Factor Analysis
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.For an event with a complicated course, the method breaks down the contributing factors along the timeline. It shows how conditions, decisions, and reactions together produce a course of events.
Complexitydifferent
LowHighLowHigh
Timedifferent
20–45 min2-6 h30-60 min2-6 h
Participantsdifferent
Small cross-functional group3-83-103-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Risk list, Mitigation plan, Assumption logCurrent Reality Tree, Core Problems, Intervention IdeasRisk Matrix, Top Risk ListEvent Timeline, Causal Factor Chart, Cause List, Corrective Actions
Tagsno overlap
RiskDecisionFailurePlanning
Systems thinkingRoot causeConstraintsCausality
RiskDecisionPrioritizationAssessment
CausalityIncidentRoot causeTimeline
Add more methods