Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of Riskiest Assumption Test with a method-specific labelled workspace.
Product Discovery
Riskiest Assumption Test
Paper illustration for Fake Door Test
Product Discovery
Fake Door Test
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When an idea hinges on one critical unknown, it prioritizes testing that exact piece of uncertainty first. It separates problem, assumption, solution, and evidence. The result is captured as a prioritized list of assumptions, a test plan, and a result report.When demand is still unclear, it measures interest in a feature before it is built. It separates real behavior from polite agreement and deliberately keeps build effort small.
Complexitydifferent
LowHighMediumMedium
Timedifferent
20–45 min90-180 min1-2 Wochen pro Iteration1-5 Tage
Participantsdifferent
Small cross-functional group3-82-6Nutzertraffic
Formatdifferent
WorkshopWorkshopWorkshop + asyncAsync
Outputdifferent
Risk list, Mitigation plan, Assumption logCoD Table, Prioritization SequencePrioritized Assumption List, Test Plan, Results ReportClick Data, Interest Signal, Learning Decision
Tagsno overlap
RiskDecisionFailurePlanning
PrioritizationDeliveryEconomicsDecision
ExperimentsValidationDiscoveryAssumptions
ValidationExperimentsDemandDiscovery