methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.
Complexitysame
LowLowLowLow
Timedifferent
20–45 min30-90 min60-90 min45-90 min
Participantsdifferent
Small cross-functional group2-84-122-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Risk list, Mitigation plan, Assumption logConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesAnnotated Diagram, Prioritized Risk List, Action BacklogAssumption List, Critical Assumptions, Learning Plan
Tagsno overlap
RiskDecisionFailurePlanning
ConstraintsDecisionPlanningOptions
RiskArchitectureWorkshopValidation
AssumptionsRiskDecisionDiscovery
Add more methods