View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Pre-Mortem | ![]() Operations Causal Factor Analysis | ![]() DevOps Blameless Postmortem | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | For an event with a complicated course, the method breaks down the contributing factors along the timeline. It shows how conditions, decisions, and reactions together produce a course of events. | After an incident with damage or a near miss, the method creates a sober field for learning without assigning blame. It directs attention to the course of events, conditions, and effective countermeasures. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | High | Medium | Low |
Timedifferent | 20–45 min | 2-6 h | 30-90 min | 45-90 min |
Participantsdifferent | Small cross-functional group | 3-10 | 3-12 | 2-8 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Risk list, Mitigation plan, Assumption log | Event Timeline, Causal Factor Chart, Cause List, Corrective Actions | Postmortem Doc, Action Items, Timeline | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | RiskDecisionFailurePlanning | CausalityIncidentRoot causeTimeline | Site Reliability EngineeringIncidentLearningReliability | AssumptionsRiskDecisionDiscovery |



