View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
Selected:Pre-MortemARID (Active Reviews for Intermediate Designs)Constraint AnalysisAssumption Surfacing
| Criterion | ![]() Decision Making Pre-Mortem | ![]() Architecture ARID (Active Reviews for Intermediate Designs) | ![]() Decision Making Constraint Analysis | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | Medium | Low | Low |
Timedifferent | 20–45 min | 2–4 h review as a planning range; preparation and evaluation additional | 30-90 min | 45-90 min |
Participantsdifferent | Small cross-functional group | Designers, developers as users, and facilitation | 2-8 | 2-8 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Risk list, Mitigation plan, Assumption log | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | RiskDecisionFailurePlanning | ArchitectureEngineeringFeedbackValidationTasks | ConstraintsDecisionPlanningOptions | AssumptionsRiskDecisionDiscovery |



