methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
LowMediumLowLow
Timedifferent
20–45 min2–4 h review as a planning range; preparation and evaluation additional15-45 min60-90 min
Participantsdifferent
Small cross-functional groupDesigners, developers as users, and facilitation1-34-12
Formatdifferent
WorkshopWorkshop + asyncAsyncWorkshop
Outputdifferent
Risk list, Mitigation plan, Assumption logPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsADR File, Decision Log, RationaleAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
RiskDecisionFailurePlanning
ArchitectureEngineeringFeedbackValidationTasks
ArchitectureRationaleDocumentationGovernance
RiskArchitectureWorkshopValidation
Add more methods