methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
LowMediumLowLow
Timedifferent
20–45 min1-2 h30-90 min30-60 min
Participantsdifferent
Small cross-functional group4-122-82-8
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Risk list, Mitigation plan, Assumption logAlignment Map, Open Issues, Decision QuestionsConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
RiskDecisionFailurePlanning
AlignmentStakeholdersStrategyFacilitation
ConstraintsDecisionPlanningOptions
StakeholdersFacilitationAlignmentPlanning
Add more methods