methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.
Complexitydifferent
LowLowLowMedium
Timedifferent
20–45 min15-45 min30 min Setup, dann laufend1-3 Tage
Participantsdifferent
Small cross-functional group1-31-3 maintaining, briefing for everyone1-4
Formatdifferent
WorkshopAsyncAsyncWorkshop + async
Outputdifferent
Risk list, Mitigation plan, Assumption logADR File, Decision Log, RationaleRAID Log, Status Report SourceArchitecture Views, Cross-view Notes, Rationale
Tagsno overlap
RiskDecisionFailurePlanning
ArchitectureRationaleDocumentationGovernance
RiskTrackingStakeholdersGovernance
DocumentationStakeholdersArchitecture
Add more methods