methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration for Communication Plan
Delivery
Communication Plan
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.When many people need to be informed in parallel and messages would otherwise arrive unevenly or too late, a Communication Plan orders communication reliably. Channels, audiences, and cadences interlock so important information doesn't get lost.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.
Complexitysame
LowLowLowLow
Timedifferent
20–45 min15-45 min45-90 min30 min Setup, dann laufend
Participantsdifferent
Small cross-functional group1-32-61-3 maintaining, briefing for everyone
Formatdifferent
WorkshopAsyncWorkshop + asyncAsync
Outputdifferent
Risk list, Mitigation plan, Assumption logADR File, Decision Log, RationaleCommunication Plan, Channel Matrix, Message CadenceRAID Log, Status Report Source
Tagsno overlap
RiskDecisionFailurePlanning
ArchitectureRationaleDocumentationGovernance
CommunicationStakeholdersDeliveryPlanning
RiskTrackingStakeholdersGovernance
Add more methods