View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Power Interest Grid | ![]() Facilitation Stakeholder Mapping | ![]() Innovation SCAMPER |
|---|---|---|---|
Purposedifferent | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | When an initiative depends on many people, interests, and power dynamics, Stakeholder Mapping systematically orders the environment. It shows who influences, who is affected, and where relationship management or safeguarding matters first. | For an existing solution under pressure to change, the method deliberately opens space for systematic variants. It directs attention to rebuilding, combining, and repurposing rather than only new basic ideas. This produces concrete evolution paths for products, offerings, or workflows. |
Complexitysame | Low | Low | Low |
Timedifferent | 30-60 min | 60–90 min | 30-60 min |
Participantsdifferent | 2-8 | 2-8 | 2-10 |
Formatdifferent | Workshop | Workshop + async | Workshop |
Outputdifferent | Power Interest Grid, Strategy per Stakeholder | Stakeholder Map, Engagement Plan, Risk Notes | SCAMPER Idea List, Concept Shortlist, Variation Notes |
Tagsno overlap | StakeholdersFacilitationAlignmentPlanning | StakeholdersAlignmentFacilitationChange | BrainstormingIdeationCreativityReframingInnovation |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






