methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Purposedifferent
When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.When an initiative depends on many people, interests, and power dynamics, Stakeholder Mapping systematically orders the environment. It shows who influences, who is affected, and where relationship management or safeguarding matters first.
Complexitydifferent
LowLowHighLow
Timedifferent
30-60 min30-60 minSeveral meetings plus preparation and analysis; total effort depends on scope60–90 min
Participantsdifferent
2-83-10Evaluation team, architects, and relevant stakeholders2-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Power Interest Grid, Strategy per StakeholderRisk Matrix, Top Risk ListPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsStakeholder Map, Engagement Plan, Risk Notes
Tagsno overlap
StakeholdersFacilitationAlignmentPlanning
RiskDecisionPrioritizationAssessment
ArchitectureQualityRiskTradeoffsStakeholders
StakeholdersAlignmentFacilitationChange
Add more methods