methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration of the McKinsey 7S Framework with seven connected fields
Business Strategy
McKinsey 7S
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Purposedifferent
When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.McKinsey 7S checks whether Strategy, Structure, Systems, Shared Values, Skills, Style, and Staff fit together. Organizational misalignments become visible across multiple levers as a result.When an initiative depends on many people, interests, and power dynamics, Stakeholder Mapping systematically orders the environment. It shows who influences, who is affected, and where relationship management or safeguarding matters first.
Complexitydifferent
LowHighMediumLow
Timedifferent
30-60 min2-4 h2-4 h60–90 min
Participantsdifferent
2-83-83-122-8
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Power Interest Grid, Strategy per StakeholderFuture Reality Tree, Negative Branches, Assumption List, Improved Injections7S Assessment, Alignment Gaps, Change ActionsStakeholder Map, Engagement Plan, Risk Notes
Tagsno overlap
StakeholdersFacilitationAlignmentPlanning
Theory of ConstraintsSystems thinkingChange
OrganizationStrategyAlignmentChange
StakeholdersAlignmentFacilitationChange
Add more methods