View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Power Interest Grid | ![]() Systems Thinking Future Reality Tree | ![]() Business Strategy McKinsey 7S | ![]() Systems Thinking Leverage Points |
|---|---|---|---|---|
Purposedifferent | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | McKinsey 7S checks whether Strategy, Structure, Systems, Shared Values, Skills, Style, and Staff fit together. Organizational misalignments become visible across multiple levers as a result. | Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy. |
Complexitydifferent | Low | High | Medium | High |
Timedifferent | 30-60 min | 2-4 h | 2-4 h | Half day |
Participantsdifferent | 2-8 | 3-8 | 3-12 | 3-12 |
Formatsame | Workshop | Workshop | Workshop | Workshop |
Outputdifferent | Power Interest Grid, Strategy per Stakeholder | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | 7S Assessment, Alignment Gaps, Change Actions | Leverage Map, Action Strategy |
Tagsno overlap | StakeholdersFacilitationAlignmentPlanning | Theory of ConstraintsSystems thinkingChange | OrganizationStrategyAlignmentChange | Systems thinkingChangeStrategy |



