methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a Polarity Map with two poles and four quadrants
Systems Thinking
Polarity Mapping
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model
Purposedifferent
Polarity Mapping makes tensions between two opposing poles tangible, such as standardization and adaptation or control and autonomy. The method guards against making apparent either-or decisions prematurely.Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy.
Complexitysame
MediumMediumMediumMedium
Timedifferent
1-2 h1-3 Tage1-2 h60-90 min
Participantsdifferent
3-121-44-123-6
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop
Outputdifferent
Polarity Map, Warning Signs, Balance ActionsArchitecture Views, Cross-view Notes, RationaleAlignment Map, Open Issues, Decision QuestionsSalience Diagram, Strategy per Class
Tagsno overlap
Systems thinkingTradeoffsLeadership
DocumentationStakeholdersArchitecture
AlignmentStakeholdersStrategyFacilitation
StakeholdersFacilitationAlignmentGovernance
Add more methods