methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a Polarity Map with two poles and four quadrants
Systems Thinking
Polarity Mapping
Rich Picture workspace showing the question, observations, and next decision.
Systems Thinking
Rich Picture
Paper illustration for Sailboat Retrospective
Agile
Sailboat Retrospective
Paper illustration for Accountability Ladder
Operations
Accountability Ladder
Purposedifferent
Polarity Mapping makes tensions between two opposing poles tangible, such as standardization and adaptation or control and autonomy. The method guards against making apparent either-or decisions prematurely.A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early.When a team wants to read momentum, brakes, and risks together, it offers an easily understandable picture of the situation. It makes drive, obstacles, and headwind visible in the same picture.With defensive reactions to problems, the method shifts the view from justification to ownership. It makes visible which reaction stage a person or team is currently stuck on.
Complexitydifferent
MediumLowLowLow
Timedifferent
1-2 h30-90 min45-90 min20-45 min
Participantsdifferent
3-122-104-121-8
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Polarity Map, Warning Signs, Balance ActionsRich Picture, Problem Framing NotesSailboat Board, Risks, Improvement ActionsOwnership Reflection, Action Commitment, Coaching Notes
Tagsno overlap
Systems thinkingTradeoffsLeadership
Systems thinkingSoft systemsFramingVisualization
RetrospectiveTeamImprovement
ResponsibilityLeadershipTeam
Add more methods