methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a Polarity Map with two poles and four quadrants
Systems Thinking
Polarity Mapping
Rich Picture workspace showing the question, observations, and next decision.
Systems Thinking
Rich Picture
Paper illustration for Sailboat Retrospective
Agile
Sailboat Retrospective
A structured reflection surfaces what was liked, learned, lacked, and longed for. It is a conversation format and does not validate actions automatically.
Agile
4Ls Retrospective
Purposedifferent
Polarity Mapping makes tensions between two opposing poles tangible, such as standardization and adaptation or control and autonomy. The method guards against making apparent either-or decisions prematurely.A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early.When a team wants to read momentum, brakes, and risks together, it offers an easily understandable picture of the situation. It makes drive, obstacles, and headwind visible in the same picture.When a sprint should not only be assessed but also learned from, it captures experience in clear learning categories. It records what worked, what's missing, and what should run differently next time.
Complexitydifferent
MediumLowLowLow
Timedifferent
1-2 h30-90 min45-90 min45–75 min
Participantsdifferent
3-122-104-12Team members involved
Formatsame
WorkshopWorkshopWorkshopWorkshop
Outputdifferent
Polarity Map, Warning Signs, Balance ActionsRich Picture, Problem Framing NotesSailboat Board, Risks, Improvement Actions4Ls Board, Learning Themes, Improvement Actions
Tagsno overlap
Systems thinkingTradeoffsLeadership
Systems thinkingSoft systemsFramingVisualization
RetrospectiveTeamImprovement
RetrospectiveLearningReflectionTeam
Add more methods