methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a Polarity Map with two poles and four quadrants
Systems Thinking
Polarity Mapping
Paper illustration for PDCA Cycle.
Operations
PDCA Cycle
Paper illustration for DMAIC.
Operations
DMAIC
Paper illustration for Standard Work Analysis.
Operations
Standard Work Analysis
Purposedifferent
Polarity Mapping makes tensions between two opposing poles tangible, such as standardization and adaptation or control and autonomy. The method guards against making apparent either-or decisions prematurely.For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode.For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together.When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude.
Complexitydifferent
MediumLowHighMedium
Timedifferent
1-2 h1 h bis mehrere Wochen2-12 Wochen1-3 h
Participantsdifferent
3-121-83-102-6
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Polarity Map, Warning Signs, Balance ActionsPDCA Log, Experiment Plan, Learning Outcome, Standard ChangeProject Charter, Measurement Plan, Cause Analysis, Control PlanStandard Work Sheet, Deviation List, Improved Standard, Training Needs
Tagsno overlap
Systems thinkingTradeoffsLeadership
Continuous improvementLeanExperiments
Continuous improvementQualityProcess improvement
LeanProcessQuality
Add more methods