methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a Polarity Map with two poles and four quadrants
Systems Thinking
Polarity Mapping
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
Polarity Mapping makes tensions between two opposing poles tangible, such as standardization and adaptation or control and autonomy. The method guards against making apparent either-or decisions prematurely.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
MediumLowHighLow
Timedifferent
1-2 h60-90 minSeveral meetings plus preparation and analysis; total effort depends on scope60-90 min
Participantsdifferent
3-124-10Evaluation team, architects, and relevant stakeholders4-12
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Polarity Map, Warning Signs, Balance ActionsProblem Cluster, Prioritized Challenge, ExperimentPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
Systems thinkingTradeoffsLeadership
FacilitationDecisionProblem solvingWorkshop
ArchitectureQualityRiskTradeoffsStakeholders
RiskArchitectureWorkshopValidation
Add more methods