methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a Polarity Map with two poles and four quadrants
Systems Thinking
Polarity Mapping
A structured reflection surfaces what was liked, learned, lacked, and longed for. It is a conversation format and does not validate actions automatically.
Agile
4Ls Retrospective
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Purposedifferent
Polarity Mapping makes tensions between two opposing poles tangible, such as standardization and adaptation or control and autonomy. The method guards against making apparent either-or decisions prematurely.When a sprint should not only be assessed but also learned from, it captures experience in clear learning categories. It records what worked, what's missing, and what should run differently next time.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.
Complexitydifferent
MediumLowHighMedium
Timedifferent
1-2 h45–75 min2-4 h60-120 min
Participantsdifferent
3-12Team members involved3-82-8
Formatsame
WorkshopWorkshopWorkshopWorkshop
Outputdifferent
Polarity Map, Warning Signs, Balance Actions4Ls Board, Learning Themes, Improvement ActionsFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsConflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments
Tagsno overlap
Systems thinkingTradeoffsLeadership
RetrospectiveLearningReflectionTeam
Theory of ConstraintsSystems thinkingChange
Theory of ConstraintsAssumptionsSystems thinking
Add more methods