methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for PERT Estimation.
Decision Making
PERT Estimation
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration for Intervention Mapping.
Systems Thinking
Intervention Mapping
Purposedifferent
On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain.
Complexitydifferent
MediumMediumHighHigh
Timedifferent
15-45 min10-30 min je Item2-4 h1-5 Tage
Participantsdifferent
1-81-83-84-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
PERT Estimate, Expected Value, Risk NotesThree-Point Estimate, Risk Range, Assumption NotesFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsLogic Model, Change Objectives, Intervention Components, Evaluation Plan
Tagsno overlap
EstimationUncertaintyRisk
EstimationUncertaintyForecasting
Theory of ConstraintsSystems thinkingChange
ChangeSystems thinkingCapability
Add more methods