View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making PERT Estimation | ![]() Decision Making Three-Point Estimation | ![]() Operations Failure Mode and Effects Analysis | ![]() Operations Fault Tree Analysis |
|---|---|---|---|---|
Purposedifferent | On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes. | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. |
Complexitydifferent | Medium | Medium | High | High |
Timedifferent | 15-45 min | 10-30 min je Item | 2-6 h | 2-6 h |
Participantsdifferent | 1-8 | 1-8 | 3-10 | 3-8 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop + async |
Outputdifferent | PERT Estimate, Expected Value, Risk Notes | Three-Point Estimate, Risk Range, Assumption Notes | FMEA Table, Risk Priority, Mitigation Actions | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions |
Tagsno overlap | EstimationUncertaintyRisk | EstimationUncertaintyForecasting | RiskQualityOperationsRoot cause | RiskRoot causeSafety |



