methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for PERT Estimation.
Decision Making
PERT Estimation
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration of Riskiest Assumption Test with a method-specific labelled workspace.
Product Discovery
Riskiest Assumption Test
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Purposedifferent
On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.When an idea hinges on one critical unknown, it prioritizes testing that exact piece of uncertainty first. It separates problem, assumption, solution, and evidence. The result is captured as a prioritized list of assumptions, a test plan, and a result report.The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.
Complexitydifferent
MediumHighMediumMedium
Timedifferent
15-45 min2-4 h1-2 Wochen pro Iteration60-120 min
Participantsdifferent
1-83-82-62-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
PERT Estimate, Expected Value, Risk NotesFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsPrioritized Assumption List, Test Plan, Results ReportConflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments
Tagsno overlap
EstimationUncertaintyRisk
Theory of ConstraintsSystems thinkingChange
ExperimentsValidationDiscoveryAssumptions
Theory of ConstraintsAssumptionsSystems thinking
Add more methods