methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for PERT Estimation.
Decision Making
PERT Estimation
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration for Intervention Mapping.
Systems Thinking
Intervention Mapping
Purposedifferent
On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain.
Complexitydifferent
MediumHighMediumHigh
Timedifferent
15-45 min2-4 h60-120 min1-5 Tage
Participantsdifferent
1-83-82-84-12
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop + async
Outputdifferent
PERT Estimate, Expected Value, Risk NotesFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsConflict Cloud, Assumption List, Breakthrough Ideas, Next ExperimentsLogic Model, Change Objectives, Intervention Components, Evaluation Plan
Tagsno overlap
EstimationUncertaintyRisk
Theory of ConstraintsSystems thinkingChange
Theory of ConstraintsAssumptionsSystems thinking
ChangeSystems thinkingCapability
Add more methods