methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for PERT Estimation.
Decision Making
PERT Estimation
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Purposedifferent
On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.
Complexitydifferent
MediumLowLowLow
Timedifferent
15-45 min1-4 h15-45 min30 min Setup, dann laufend
Participantsdifferent
1-81-51-31-3 maintaining, briefing for everyone
Formatdifferent
Workshop + asyncWorkshop + asyncAsyncAsync
Outputdifferent
PERT Estimate, Expected Value, Risk NotesContext Diagram, Container Diagram, Component DiagramADR File, Decision Log, RationaleRAID Log, Status Report Source
Tagsno overlap
EstimationUncertaintyRisk
ArchitectureCommunicationVisualization
ArchitectureRationaleDocumentationGovernance
RiskTrackingStakeholdersGovernance
Add more methods