View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making PERT Estimation | ![]() Operations Barrier Analysis | ![]() Operations Fault Tree Analysis | ![]() Operations 5 Whys |
|---|---|---|---|---|
Purposedifferent | On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes. | For a risk that can only be managed through multiple layers of protection, the method examines the effectiveness of each barrier. It shows where safeguards are missing, too weak, or fail under real conditions. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. |
Complexitydifferent | Medium | Medium | High | Low |
Timedifferent | 15-45 min | 2-4 h | 2-6 h | 15-30 min |
Participantsdifferent | 1-8 | 2-6 | 3-8 | 2-6 |
Formatdifferent | Workshop + async | Workshop + async | Workshop + async | Workshop |
Outputdifferent | PERT Estimate, Expected Value, Risk Notes | Barrier Inventory, Failure Analysis per Barrier, Action Backlog | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Root cause notes, Countermeasures |
Tagsno overlap | EstimationUncertaintyRisk | Root causeSafetyIncident | RiskRoot causeSafety | Root causeIncidentLeanProblem solving |



