methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of two user profile cards with a goal, behavior evidence, and an open research question.
UX Research
Personas
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
When target groups stay too vague and teams talk about the same people differently, personas create a shared, solid picture of usage. Condensed profiles make needs, contexts, and differences tangible enough for decisions.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
MediumMediumHighLow
Timedifferent
1-3 Tage2–4 h review as a planning range; preparation and evaluation additional2-6 h60-90 min
Participantsdifferent
Internes TeamDesigners, developers as users, and facilitation3-104-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Persona Profiles, Needs Summary, Scenario NotesPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsFMEA Table, Risk Priority, Mitigation ActionsAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
ResearchCustomerSynthesis
ArchitectureEngineeringFeedbackValidationTasks
RiskQualityOperationsRoot cause
RiskArchitectureWorkshopValidation
Add more methods