View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations PDCA Cycle | ![]() Agile Three Amigos | ![]() Agile Specification by Example | ![]() Operations DMAIC |
|---|---|---|---|---|
Purposedifferent | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. | When story, test, and implementation could drift apart, it brings business perspective, engineering, and quality together early. It prevents a story from being read differently only late in the process. | When business rules need to become precise, it ties language, example, and test together. It sorts work by value, risk, and delivery ability. The result is captured as an Example Table and Acceptance Tests. | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. |
Complexitydifferent | Low | Low | Medium | High |
Timedifferent | 1 h bis mehrere Wochen | 15-30 min | 60-90 min pro Feature | 2-12 Wochen |
Participantsdifferent | 1-8 | 3 | 3-6 | 3-10 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop + async |
Outputdifferent | PDCA Log, Experiment Plan, Learning Outcome, Standard Change | Clarified Story, Test Examples, Open Questions | Example Table, Acceptance Tests | Project Charter, Measurement Plan, Cause Analysis, Control Plan |
Tagsno overlap | Continuous improvementLeanExperiments | CollaborationBehavior-Driven DevelopmentQualityRefinement | AgileRequirementsExamplesBehavior-Driven Development | Continuous improvementQualityProcess improvement |