methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for PDCA Cycle.
Operations
PDCA Cycle
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Waste Analysis.
Operations
Waste Analysis
Paper illustration for DMAIC.
Operations
DMAIC
Purposedifferent
For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery.For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together.
Complexitydifferent
LowMediumLowHigh
Timedifferent
1 h bis mehrere WochenOngoing45-120 min2-12 Wochen
Participantsdifferent
1-82-122-83-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
PDCA Log, Experiment Plan, Learning Outcome, Standard ChangeKanban board, WIP policies, Flow metricsWaste Map, Prioritized Waste, Improvement BacklogProject Charter, Measurement Plan, Cause Analysis, Control Plan
Tagsno overlap
Continuous improvementLeanExperiments
FlowVisual managementDelivery
WasteLeanProcess improvement
Continuous improvementQualityProcess improvement
Add more methods