View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations PDCA Cycle | ![]() Operations Kaizen Event | ![]() Innovation Lean Startup | ![]() Growth A/B Testing |
|---|---|---|---|---|
Purposedifferent | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | For uncertain business assumptions, the method forces the idea into contact with real market reactions early. It separates wishful picture, assumption, and observable behavior, so that learning becomes faster than planning. This translates uncertainty into measurable insight. | When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects. |
Complexitydifferent | Low | Medium | Medium | High |
Timedifferent | 1 h bis mehrere Wochen | 0.5-5 Tage | Wochen bis Monate je Lernzyklus | 1-4 Wochen |
Participantsdifferent | 1-8 | 4-10 | 2-8 | 1-6 |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Async |
Outputdifferent | PDCA Log, Experiment Plan, Learning Outcome, Standard Change | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | Hypothesis list, MVPs, Learning reports, Pivot or persevere decision | Experiment results, Decision log, Learning summary |
Tagsno overlap | Continuous improvementLeanExperiments | LeanContinuous improvementOperations | LeanStartupValidationMVP | ExperimentsGrowthAnalyticsValidation |



